The Aldeadávila Dam is a Spanish concrete arch-gravity dam, straddling the border between Spain and Portugal on the Duero River. The nearest town is Aldeadávila de la Ribera in the province of Salamanca, about 11.3 kilometres (7.0 mi) to the east. The nearest Portuguese town is Fornos in Bragança District, about 8 kilometres (5.0 mi) to the southwest. The Portuguese side of the river around the dam site lies within the Arribes del Duero Natural Park.

Fonte: Wikipedia (en)Atualizado em 05/11/2026
01

Overview

In 1864, Portugal and Spain signed the "Treaty of Limits" (ratified in 1866), which established the present international boundaries of the two nations. A treaty on transboundary rivers, clarifying issues regarding the use of such rivers, was signed and affirmed in 1912. A treaty regulating the development of hydroelectric facilities on the Duero River was signed in 1927. The Aldeadávila Dam was built by Spain pursuant to these treaties, and was the final dam to be built by Spain on the section of river allotted to that country. The dam is 140 metres (460 ft) high and its cost was estimated in 1962 at US$60 million (about $443.5 million in 2010 inflated-adjusted dollars). It was one of a series of very high dams built in Europe in the two decades after World War II; these were designed with a downstream face inclined toward the upstream flow. This simplified the dam's design and construction (although it required more concrete to build), and more readily incorporated the spillways into the dam face. The dam's face is nearly vertical. Design work on the dam began in 1956, and construction completed in 1963. The structure was built by the Iberdrola Ingeniería y Construcción construction firm. Pedro Martínez Artola was the design engineer. The dam was built on high-quality granite rock. During construction, grouting was used to fill cracks in the rock which ran parallel to the dam's foundation, and on the Portuguese bank where two fractures in the rock occurred.

Power plant

Until the Alcántara Dam, also in Spain, was built in 1969, the Aldeadávila Dam was the largest hydroelectric power plant in Western Europe. As of 2018, and after some upgrades, it remains the largest in Spain, with a total output generating power of 1,142 megawatts (1,531,000 hp). The dam's original Aldeadávila I Power Station houses six 119.2-megawatt (159,800 hp) Francis turbines for a total generating output of 718.2 megawatts (963,100 hp). In 1986, the Aldeadávila II Power Station extension was completed, adding two 210.5-megawatt (282,300 hp) Francis pump-turbines, boosting generating capacity by 421 megawatts (565,000 hp). During periods when the demand for electricity is low (such as evenings, weekends, or during seasonal fluctuations), the dam's two pumped-storage generators can use its excess power-generating capacity to pump water back into the reservoir—enhancing reservoir capacity and storing water for periods when the demand for electricity is high. At the time it was constructed, the Aldeadávila Dam had the largest pumping station capacity in Europe.

02

In popular culture

A 30-minute documentary about the dam, La presa de Aldeadávila, was produced by Iberduero (the power company that built the dam) in 1963. Several scenes in the 1965 David Lean film Doctor Zhivago were filmed at the Aldeadávila Dam. The dam's famous spillways were opened for the filming, and are shown in the motion picture open at full force. Another scene depicts workers walking into one of the dam's enormous tunnels. The final scenes of Antonio Mercero's 1972 film, La cabina (The Telephone Box) were also filmed inside the dam. Terminator: Dark Fate filmed a scene at the dam. Fast X was also filmed at the dam.